Wait — Pauses the run before the next step — holds the run for a set time, then carries on from where it stopped. Use it for a reminder two days after an invoice, or a follow-up next week.

Who can do this

Workspace Admins and Editors, on every plan.

Steps

  1. Select + where the pause should be. In the step picker, open Timing and select Wait.
  2. In For, type how many — it starts at 5. Up to 30 days. A test run does not wait — the item goes straight on.
  3. In Of, choose minutes, hours or days.

The card reads Wait · 2 days.

Output

The items as they came. Waiting changes when, not what.

What happens next

  • The run shows as waiting, with when it picks up. It is not stuck, and it uses no runs while it waits.
  • It carries on exactly where it stopped, with everything the earlier steps found.
  • In a test, it is skipped — the card says skipped — so you are not left watching.

Good to know

  • At least 1 minute, at most 30 days.
  • Not inside Loop Over Items. Put it after the loop.
  • Waits are the way past a run's 15-minute limit: the time between Waits is what counts.
  • If the plan changes while a run waits so that a later step needs a paid plan, the run stops there, failed, saying why.
  • Run this step is not offered for a Wait — there is nothing to run on its own.

If something goes wrong

What the run says Why What to do
Wait for at least a minute and at most 30 days. For is 0, empty, or more than 30 days. Set a time within that.
Needs setup: a Wait cannot run inside Loop Over Items. Move it after the loop. The Wait is on a loop's repeated path. Move it.